Announcement

Collapse
No announcement yet.

Armenian Nuclear Power Plant [ANPP] Increased Electric Power Yield B

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Armenian Nuclear Power Plant [ANPP] Increased Electric Power Yield B

    ARMENIAN NUCLEAR POWER PLANT [ANPP] INCREASED ELECTRIC POWER YIELD BY 0,7% OVER NINE MONTHS OF 2007

    ArmInfo, Armenia
    Oct 15 2007

    ArmInfo. Armenian Nuclear Power Plant [ANPP] increased electric
    power yield by 0,7% - up to 2,200 bln kWt/h over nine months of 2007
    against 2,184 bln over the same period of 2006, Director General of
    ANPP Gagik Markosyan told ArmInfo correspondent.

    He also added that over the reported period the ANPP gave 2,022 bln
    kWt/h electric power to the energy system of the country against 2,009
    over the same period of 2006. Director general recalled that since
    10 October ANPP has been stopped for 45 days for annual prophylactic
    repair and refuelling with nuclear fuel.

    To recall, in September 2003 ANPP was given to CJSC "Inter RAO UES"
    for finance management over five years.

    From: Emil Lazarian | Ararat NewsPress
Working...
X