Announcement

Collapse
No announcement yet.

Second Iran-Armenia Highway Opened In Meghri With Participation Of A

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Second Iran-Armenia Highway Opened In Meghri With Participation Of A

    SECOND IRAN-ARMENIA HIGHWAY OPENED IN MEGHRI WITH PARTICIPATION OF ARMENIAN PRESIDENT

    arminfo
    2007-10-26 13:45:00

    ArmInfo. The Armenian section of Iran-Armenia interstate highway
    worth $45 million was officially opened in Meghri with participation
    of Armenian President Robert Kocharyan, Friday.

    In his speech, President Kocharyan said that highway is of great
    strategic importance for Armenia and will boost the commodity
    turnover with Iran. It may become a transit highway as well. The
    president thanked the builders for high quality work and stressed
    that the highway meets international standards unlike the old one
    (Kapan-Kajaran-Meghri). The president said the construction of the
    new Karan-Tsav-Meghri section of the highway will also boost the trade
    with Syunik hereby raising the living standards in the region. Robert
    Kocharyan stressed the necessity of continuing the construction
    of Kapan-Sisian section. He also added that Armenia is seriously
    discussing the project of railway construction with Iran at present.

    The data of the Armenian Ministry of Transport and Communication say
    that the construction of the 90km Karan-Tsav-Meghri section started in
    2005. The 40 km section Verishen-Tsav was fundamentally reconstructed
    and the remaining 50 km were repaired. The state budget approved
    15.2 billion drams ($45 million on current exchange rate) for this
    purpose. The average lorry speed on the new highway is 55-60 km/h
    as against 35-75 km/h on the old road. Although the new highway is
    longer, its travel time is 1 hour and 45 minutes as against 2 hours
    and 10 minutes of the old one. The road capacity of the highway is
    about 80 tons as against 35 tons of the old way. The highest datum is
    2.215m as against 2.535 of the old way. The camber angle was reduced
    by 10-14% to 8-9%.
Working...
X