Announcement

Collapse
No announcement yet.

Potential Of Small Hydropower Plants In Gegharkunik Marz Makes 119 M

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Potential Of Small Hydropower Plants In Gegharkunik Marz Makes 119 M

    POTENTIAL OF SMALL HYDROPOWER PLANTS IN GEGHARKUNIK MARZ MAKES 119 MILLION KILOWATT-HOURS ANNUALLY

    Noyan Tapan
    Dec 6, 2007

    YEREVAN, DECEMBER 6, NOYAN TAPAN. The European Commission has
    assessed the potential of renewable energy in Armenia, particularly
    in the Sevan Lake basin. According to the European Commission, the
    potential of small hydropower plants in Gegharkunik marz makes 119
    million kwh annually.

    Besides, monitoring of wind energy was implemented in the marz -
    in the Semyonovka moutain pass. The monitoring has given a basis for
    design and feasibility study of a wind power plant with the capacity
    of 14.5 megawatts.

    During the December 6 meeting with reporters, the RA minister of energy
    Armen Movsisian said that Armenia's small hydropower plants currently
    generate energy that meets 5% of the total demand of the country,
    and this index will be increased to 10% within the next 2-3 years.
Working...
X